Hiring a Contractor to Build or Renovate — BOQs, Payment Milestones, Retention and a Contract That Prevents Abandoned Jobs
Tips & Guides

Hiring a Contractor to Build or Renovate — BOQs, Payment Milestones, Retention and a Contract That Prevents Abandoned Jobs

MyProperty Team September 11, 2026 11 min read 1 views

Key Takeaways

  • • Compare contractors on itemised BOQs showing materials and quantities, not one-line totals
  • • Pay only for inspected milestones, and never let payments run ahead of completed work
  • • Retain part of the price until the warranty period ends — it's what brings contractors back to fix defects

Whether building on your own land, extending a rear kitchen or renovating a whole second-hand house, choosing a contractor affects money, time and the quality of your home for decades. The familiar stories: deposits taken and jobs abandoned, substandard work, or mid-job demands that blow the budget. Most of these are preventable with a good selection process and contract — both of which owners control from the start.

Start With Clear Drawings and Scope

Contractors quote accurately when drawings and specifications are clear. New builds or structural extensions need architectural and structural drawings by an architect and engineer, which are also required for the building permit. For renovations, list the work room by room and specify materials — brand and model of tiles, sanitaryware, cables. The clearer the detail, the more comparable the quotes.

Shortlisting Contractors

  1. Get at least three — via recommendations from past clients, architects or engineers.
  2. See real work — visit completed or ongoing projects and talk to those owners.
  3. Check business status — for companies, the company certificate, registered capital and history; for individuals, ID and a traceable address.
  4. Assess the team — who supervises on site, whether an engineer oversees structure, whether crews are permanent or day labour.
  5. Beware unusually low prices — far-below-market quotes usually mean downgraded materials, omitted work or later claims for more money.

The BOQ: Your Most Important Comparison Tool

A bill of quantities itemises every element — material type, quantity, unit rate and labour. With BOQs from several bidders you can instantly see who under-measured, who priced different grades, or who left work out. When variations arise during construction, the BOQ provides a fair basis for pricing them. A one-line lump-sum quote leaves the owner at a disadvantage in every negotiation.

Work and Payment Milestones

The cardinal rule: money paid must never run ahead of work completed. An example schedule for a new house:

InstalmentWork completed and inspectedNote
AdvanceContract signedKeep it small; consider requiring an advance-payment guarantee
FoundationsPiles, footings, ground beamsCheck pile count and test results against drawings
StructureColumns, beams, slabs on every floorInspect rebar before each pour
Roof and wallsRoof frame, roofing, masonryCheck waterproofing and wall alignment
SystemsElectrics, plumbing, sanitationPressure-test pipes; test circuits
FinishesPlastering, flooring, painting, doors and windowsCheck workmanship against specification
FinalHandover with all defects fixedDeduct the retention

For structural milestones, have an engineer you hire yourself do the inspection, not only the contractor's engineer.

What the Contract Must Contain

Scope referenced to the drawings and BOQ as attachments; contract price and payment schedule; start and completion dates; daily penalties for contractor-caused delay; retention, typically a share of the price returned after the warranty period; warranty length; responsibility for building permits, site safety and damage to neighbouring property; a variation procedure requiring written agreement with price before work proceeds; and termination terms if the contractor abandons the job.

During Construction

Visit regularly, photograph progress weekly, keep delivery notes, check delivered materials match the BOQ specification, and record every variation in writing. Changing your mind mid-way is normal, but verbal agreements cause almost all end-of-job money disputes.

FAQ

The contractor wants half up front for materials. Should I agree?

No. Large advances remove your leverage if the contractor walks away. If special materials must be ordered, consider paying the supplier directly yourself.

Lump-sum or separate materials and labour?

Lump-sum with a clear BOQ is convenient and easier to budget. Buying materials yourself and hiring labour only gives material quality control, but you must manage ordering and bear shortage or surplus risk.

The contractor abandoned the job. What now?

Document the completed work with photos and an engineer's valuation, send warning and termination notices per the contract, hire a new contractor to finish, and claim damages under the contract. A good contract and payments that never ran ahead of work keep losses limited.

Conclusion

Good contractors exist, but good systems matter more than trust: clear drawings and scope, BOQ comparisons, payments tied to inspected milestones, retention, and every change in writing. Read more about building permits and legal extensions on the MyProperty blog.