For anyone building a house on their own land, the first step before driving piles is a permit under the Building Control Act. Many think it's a hassle and that small houses don't need one, but unpermitted construction risks stop orders, fines and, for serious violations, demolition orders. It also causes problems obtaining a house number, permanent power and water, loans, or selling later. This guide outlines the process.
Permitting authority lies with the local official where the land is located: district offices in Bangkok, municipalities or sub-district administrative organisations in the provinces. Check first how the Building Control Act and comprehensive city plan apply there, since height, setback and permitted building types depend on both.
| Document | Details |
|---|---|
| Permit application | The local authority's form |
| Title copy | A deed or document allowing construction; owner's consent if the land belongs to someone else |
| Drawings | Site plan, architectural, structural and services drawings as required |
| Structural calculations | For buildings where the law requires them |
| Professional certifications | Signatures of the licensed architect and engineer with licence copies appropriate to building size |
| Supervisor's consent letter | For buildings legally requiring a construction supervisor |
| Owner's ID | ID card and house registration |
Setbacks from boundaries: walls or balconies with openings such as windows or doors must be set back from neighbouring land by legally prescribed distances depending on building height; solid walls without openings can sit closer, sometimes requiring the neighbour's written consent. Setbacks from roads: depend on the width of the road in front. Open space: residential buildings must leave at least the prescribed share of the largest floor area as open space. Height and use: must comply with the zoning plan. In housing estates, check estate regulations too, which can be stricter than the law.
Permit route: submit the application and drawings; officials review and issue a permit within the statutory timeframe — in principle 45 days, extendable on grounds the law allows — and construction begins once the permit is issued. Notification route: the Act lets owners notify the local official of intended construction, with drawings designed and certified by qualified professionals. Once complete notification is filed, construction can start sooner, but officials may still review afterwards and order corrections if the design is non-compliant, so designers bear full responsibility. It suits projects with experienced architects and engineers.
In principle yes, if the area falls under the Building Control Act, regardless of size. Confirm with the local authority.
Yes, but adapt the site plan to your actual plot, check setbacks and open space, and have professionals sign as required.
Sometimes a retrospective application or correction is possible if the building doesn't substantially breach the law; if it does — wrong setbacks, for instance — parts may need modifying or demolishing. Get expert advice quickly.
Building permits protect owners, neighbours and future property value. Use professionally prepared drawings, check setbacks, open space and zoning at design stage, and choose the route that suits your project. Read about choosing contractors and legal extensions on the MyProperty blog.
Was this article helpful?
Hand-picked listings related to this article
Off-plan buyers sometimes face missed completion dates, smaller units than contracted or changed facilities. What the controlled condo-sale contract guarantees, when you may terminate and claim refunds, documenting your case, complaining to the OCPB, consumer and group litigation, and checks that reduce the risk before you buy.
As rental portfolios grow, owners ask whether a company would save tax. How personal and corporate taxation of rent compare, the cost of moving existing property into a company, accounting obligations, succession through shares, and why nominee structures for foreigners are illegal and dangerous.
Every empty month costs a full month's rent plus fees and utilities. A diagnostic approach for landlords: price against real comparables, listing photos and copy, channels and agents, timing, the unit's condition and terms, and quick improvements that move a stale listing — without slashing rent blindly.